Note: Name of payload is provisional. Third launch of an ultimately 5 reconnaissance satellites for the South Korean Defense Acquisition Program Administration (DAPA), with 1 synthetic aperture radar (SAR) satellite on this launch. They will be launched to low Earth orbit between 600 and 700 km by 2025, enabling South Korea’s military to observe the nuclear-armed neighbor’s key military facilities every two hours with 30-50 centimeters resolution imagery, according to a 2019 report produced by the Korea Institute of S&T Evaluation and Planning. The project is lead by the Korean Agency for Defense Development (ADD) and Korea Aerospace Research Institute (KARI), with input from Korea Aerospace Industries (KAI), Hanwha Systems and Thales Alenia Space.
Low Earth OrbitSecond mission of the Hakuto-R commercial lunar lander developed by private Japanese company ispace. The lander will carry a small rover developed by ispace to perform studies on the moon's surface. The rover is also expected to collect lunar regolith as part of a contract with NASA signed in 2020, in which companies will collect materials on the moon and then transfer ownership "in situ" to the agency.
Lunar OrbitThis is the second mission of Nova-C lunar lander developed and built by Intuitive Machines. This time it carries a NASA payload called PRIME-1 (Polar Resources Ice Mining Experiment-1), which is to be the first demonstration of in-situ resource utilization on the Moon. PRIME-1 consists of two instruments: TRIDENT drill and Msolo mass spectrometer.
Lunar Orbit