STS-80

Circle Image

Overview

Destination: Low Earth Orbit
Mission: Astrophysics

Low Earth Orbit Launch Complex 39B Kennedy Space Center, FL, USA

STS-80 was a Space Shuttle mission flown by Space Shuttle Columbia. The launch was originally scheduled for 31 October 1996, but was delayed to 19 November for several reasons. Likewise, the landing, which was originally scheduled for 5 December, was pushed back to 7 December after bad weather prevented landing for two days. The mission was the longest Shuttle mission ever flown at 17 days, 15 hours, and 53 minutes. Although two spacewalks were planned for the mission, they were both canceled after problems with the airlock hatch prevented astronauts Tom Jones and Tammy Jernigan from exiting the orbiter.

Space Shuttle

Family: Space Shuttle
Configuration:

The Space Shuttle is a retired, partially reusable low Earth orbital spacecraft system operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS). Five complete Space Shuttle orbiter vehicles were built and flown on a total of 135 missions from 1981 to 2011.

Specifications
  • Stages
    2
  • Length
    56.1 m
  • Diameter
    8.0 m
  • Fairing Diameter
  • Launch Mass
    2030 T
  • Thrust
    28200 kN
Family
  • Name
    Space Shuttle
  • Family
    Space Shuttle
  • Variant
  • Alias
  • Full Name
    Space Shuttle
Payload Capacity
  • Launch Cost
    $450000000
  • Low Earth Orbit
    27500 kg
  • Geostationary Transfer Orbit
  • Direct Geostationary
  • Sun-Synchronous Capacity

Space Shuttle Columbia


In-active Human Rated Crew On-board: 5 Crew Capacity: 7 Payload Capacity: 27500 kg
Destination: Low Earth Orbit
Serial Number: OV-102

Space Shuttle Columbia (Orbiter Vehicle Designation: OV-102) was the first space-rated orbiter in NASA's Space Shuttle fleet. It launched for the first time on mission STS-1 on April 12, 1981, the first flight of the Space Shuttle program. Over 22 years of service, it completed 27 missions before disintegrating during re-entry near the end of its 28th mission, STS-107 on February 1, 2003, resulting in the deaths of all seven crew members.

Space Shuttle Details

Crew


Kenneth Cockrell

Commander - American - ( NASA )

Status: Retired

Date of Birth: April 9, 1950
Age: 74

Kent Rominger

Pilot - American - ( NASA )

Status: Retired

Date of Birth: Aug. 7, 1956
Age: 67

Thomas David Jones

Mission Specialist - American - ( NASA )

Status: Retired

Date of Birth: Jan. 22, 1955
Age: 69

Tamara E. Jernigan

Mission Specialist - American - ( NASA )

Status: Retired

Date of Birth: May 7, 1959
Age: 64

Story Musgrave

Mission Specialist - American - ( NASA )

Status: Retired

Date of Birth: Aug. 19, 1935
Age: 88

National Aeronautics and Space Administration

Circle Image
Administrator: Bill Nelson Founded: 1958 Successes: 115 Failures: 20 Pending: 6

Agency Type: Government

The National Aeronautics and Space Administration is an independent agency of the executive branch of the United States federal government responsible for the civilian space program, as well as aeronautics and aerospace research. NASA have many launch facilities but most are inactive. The most commonly used pad will be LC-39B at Kennedy Space Center in Florida.

INFO WIKI

Kennedy Space Center, FL, USA

Launch Complex 39B


Electron
Deployed
2 hours, 42 minutes ago
Beginning Of The Swarm (ACS3 & NeonSat-1)
Rocket Lab Launch Complex 1B - Onenui Station, Mahia Peninsula, New Zealand

NASA's Advanced Composite Solar Sail System (ACS3) is a technology demonstration mission tasked with deploying a composite boom solar sail. NeonSa…


Falcon 9
Success
2 hours, 57 minutes ago
Starlink Group 6-53
Space Launch Complex 40 - Cape Canaveral, FL, USA

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Long March 2D
Success
3 days, 1 hour ago
Yaogan 42-02
Launch Complex 3 (LC-3/LA-1) - Xichang Satellite Launch Center, People's Republic of China

The Yaogan 42-02 is a Chinese military “remote sensing” satellite of unknown purposes.


Falcon 9
Success
5 days, 2 hours ago
Starlink Group 6-52
Space Launch Complex 40 - Cape Canaveral, FL, USA

A batch of satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Falcon 9
Success
6 days, 3 hours ago
Starlink Group 6-51
Launch Complex 39A - Kennedy Space Center, FL, USA

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Long March 2D
Success
1 week, 1 day ago
SuperView Neo 3-01
Launch Area 4 (SLS-2 / 603) - Jiuquan Satellite Launch Center, People's Republic of China

Commercial Earth observation satellite built by CAST for China Siwei Survey and Mapping Technology Co. Ltd, with 0.5 m resolution over 9 image wavele…


Falcon 9
Success
1 week, 3 days ago
Starlink Group 6-49
Space Launch Complex 40 - Cape Canaveral, FL, USA

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Falcon 9
Success
1 week, 5 days ago
USSF-62
Space Launch Complex 4E - Vandenberg SFB, CA, USA

First Weather System Follow-on (WSF) satellite. WSF-M (Weather System Follow-on - Microwave) is the next-generation operational environmental sate…


Angara A5/Blok DM-03
Success
1 week, 5 days ago
Vostochny Angara Test Flight
Cosmodrome Site 1A - Vostochny Cosmodrome, Siberia, Russian Federation

First test launch of the Angara A5 launch vehicle from the Vostochny Cosmodrome. The rocket will carry a mass simulator payload.


Falcon 9
Success
1 week, 6 days ago
Starlink Group 6-48
Space Launch Complex 40 - Cape Canaveral, FL, USA

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.