Chandrayaan-4 Second Launch

Overview

Destination: Lunar Orbit
Mission: Planetary Science

Lunar Orbit Satish Dhawan Space Centre Second Launch Pad Satish Dhawan Space Centre, India

Chandrayaan-4 is a planned lunar sample-return mission of Indian Space Research Organisation (ISRO) and will be the fourth mission of its Chandrayaan programme. The mission consist of five modules, namely the DM (Descender Module), AM (Ascender Module), TM (Transfer Module), RM (Re-entry Module) and PM (Propulsion Module). The planned mission life is 1 lunar day and the landing site will be near the Lunar South Pole. The second launch will lift the TM (Transfer Module), RM (Re-entry Module) and PM (Propulsion Module) to orbit.

Updates

Cosmic_Penguin • Oct. 18, 2024, 2:32 a.m.

Added launch.


LVM-3 (GSLV Mk III)

Family:
Configuration:

The Launch Vehicle Mark-3 (LVM-3), previously called Geosynchronous Satellite Launch Vehicle Mark III (GSLV Mk III), is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). It is designed to launch satellites into geostationary orbit, and is intended as a launch vehicle for crewed missions under the Indian Human Spaceflight Programme.

Specifications
  • Max Stage
    3
  • Length
    43.4 m
  • Diameter
    4.0 m
  • Fairing Diameter
  • Launch Mass
    629.0 T
  • Thrust
    11898.0 kN
Family
  • Name
    LVM-3 (GSLV Mk III)
  • Family
  • Variant
  • Alias
  • Full Name
    Launch Vehicle Mark-3 (GSLV Mk III)
Payload Capacity
  • Launch Cost
    $46000000
  • Low Earth Orbit
    10000.0 kg
  • Geostationary Transfer Orbit
    5000.0 kg
  • Direct Geostationary
  • Sun-Synchronous Capacity

Indian Space Research Organization

Indian Space Research Organization

(ISRO)

Chairman: V. Narayanan Founded: 1969 Successes: 84 Failures: 15 Pending: 17

Agency Type:

The Indian Space Research Organisation (ISRO) is the space agency of the Government of India headquartered in the city of Bangalore. Its vision is to "harness space technology for national development while pursuing space science research and planetary exploration."

INFO WIKI

Related News

SpaceNews

India to target moon’s south pole with sample return mission

HELSINKI — India’s Chandrayaan-4 lunar sample return mission will target a landing between 85 and 90 degrees latitude in the southern hemisphere of the moon, and follow up with a […]

Satish Dhawan Space Centre, India

Satish Dhawan Space Centre Second Launch Pad


Falcon 9
Success
1 day, 11 hours ago
Starlink Group 17-42
Space Launch Complex 4E - Vandenberg SFB, CA, USA

A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.


Vega-C
Success
2 days, 10 hours ago
Solar wind Magnetosphere Ionosphere Link Explorer (SMILE)
Ariane Launch Area 1 (ELV) - Guiana Space Centre, French Guiana

Joint mission between the European Space Agency and the Chinese Academy of Sciences to investigate the interaction between Earth’s protective shield …


Long March 8
Success
3 days, 23 hours ago
SpaceSail Polar Group #9
Commercial LC-1 - Wenchang Space Launch Site, People's Republic of China

18 Low Earth Orbit communication satellites with Ku, Q and V band payloads for the G60 constellation operated by Shanghai Spacesail Technologies with…


Falcon 9
Success
5 days, 15 hours ago
Dragon CRS-2 SpX-34
Space Launch Complex 40 - Cape Canaveral SFS, FL, USA

34th commercial resupply services mission to the International Space Station operated by SpaceX. The flight will be conducted under the second Commer…


Kinetica 1
Success
6 days, 9 hours ago
5 satellites
Launch Area 130 - Jiuquan Satellite Launch Center, People's Republic of China

Share-ride of 5 satellites to sun-synchronous orbit: * Taijing-3-05A/B * Tianyi-50 * Tianyan-27 * Jilin-1 HR-03D-55


Zhuque-2E Block 2
Success
1 week ago
Mass Simulator
Launch Area 96A - Jiuquan Satellite Launch Center, People's Republic of China

2.8 tonnes Mass Simulator launched to a 900 km polar orbit on a test flight proving further upgrades to the ZQ-2E, including a longer 1st stage and e…


Long March 6A
Success
1 week, 2 days ago
SpaceSail Polar Group #8
Launch Complex 9A - Taiyuan Satellite Launch Center, People's Republic of China

18 Low Earth Orbit communication satellites with Ku, Q and V band payloads for the G60 constellation operated by Shanghai Spacesail Technologies with…


Falcon 9
Success
1 week, 2 days ago
NROL-172
Space Launch Complex 4E - Vandenberg SFB, CA, USA

Thirteenth batch of satellites for a reconnaissance satellite constellation built by SpaceX and Northrop Grumman for the National Reconnaissance Offi…


Long March 7
Success
1 week, 3 days ago
Tianzhou-10
201 - Wenchang Space Launch Site, People's Republic of China

Ninth cargo delivery mission to the Chinese space station.


Falcon 9
Success
2 weeks, 1 day ago
Starlink Group 17-29
Space Launch Complex 4E - Vandenberg SFB, CA, USA

A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.