NASA will host a media teleconference to discuss the agency’s science and technology flying aboard Intuitive Machines’ second flight to the Moon. The mission is part of NASA’s CLPS (Commercial Lunar Payload Services) initiative and Artemis campaign to establish a long-term lunar presence.
Briefing participants include:
- Joel Kearns, deputy associate administration for exploration, Science Mission Directorate, NASA Headquarters
- Niki Werkheiser, director, technology maturation, Space Technology Mission Directorate, NASA Headquarters
- Jackie Quinn, PRIME-1 principal investigator, NASA Kennedy Space Center
- Daniel Cremons, LRA deputy principal investigator, NASA Goddard Space Flight Center
- Bethany Ehlmann, Lunar Trailblazer principal investigator, CalTech University
- Trent Martin, senior vice president, space systems, Intuitive Machines
- Thierry Klein, President of Bell Labs Solution Research, Nokia
This is the second mission of Nova-C lunar lander developed and built by Intuitive Machines. This time it carries a NASA payload called PRIME-1 (Polar Resources Ice Mining Experiment-1), which is to be the first demonstration of in-situ resource utilization on the Moon. PRIME-1 consists of two instruments: TRIDENT drill and Msolo mass spectrometer. Also on board are: * Lunar Trailblazer, a small (class D) lunar orbiter, part of NASA's SIMPLEx program, that will detect and map water on the lunar surface to determine how its form, abundance, and location relate to geology. Its mission is to aid in the understanding of lunar water and the Moon's water cycle. * Odin, a spacecraft for AstroForge, a company that plans to mine asteroid resources. Odin intends to head into deep space to observe near-Earth asteroid 2022 OB5 in preparation for their first retrieval mission. Odin will fly by the asteroid at a distance of about 1 kilometer, arriving 11 months after launch. * CHIMERA GEO 1, a transfer spacecraft by Epic Aerospace to a geostationary orbit, with the aim of covering an orbital position. For this launch, CHIMERA-GEO is carrying an unidentified 16U cubesat manifested by Exolaunch.
Lunar Orbit B1083 - Flight Proven ( ) A Shortfall of GravitasA batch of 21 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
This is the second mission of Nova-C lunar lander developed and built by Intuitive Machines. This time it carries a NASA payload called PRIME-1 (Pola…
NS-30 is the 10th crewed flight for the New Shepard program and the 30th in its history.
A batch of 22 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
Ku-band geostationary communication satellite for China Satcom at 110.5° East, replacing ChinaSat 10.
A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system. First Starlink launch …
The first of five BlackSky Technology missions to deploy its new next-generation BlackSky Gen-3 satellites. The commercial constellation of Gen-3 sat…
A batch of 21 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
A batch of 21 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.