NASA will roll out their Space Launch System (SLS) rocket back to LC-39B, where it will perform a wet dress rehearsal (WDR) which involves loading the vehicle with propellants and taking the vehicle through the countdown to ignition where the countdown is halted.
The rollout is expected to take around 11 hours, and will utilize an upgraded crawler transporter - the same system its predecessors (Space Shuttle, Ares, Saturn, etc.) used.
2.8 tonnes Mass Simulator launched to a 900 km polar orbit on a test flight proving further upgrades to the ZQ-2E, including a longer 1st stage and e…
18 Low Earth Orbit communication satellites with Ku, Q and V band payloads for the G60 constellation operated by Shanghai Spacesail Technologies with…
Thirteenth batch of satellites for a reconnaissance satellite constellation built by SpaceX and Northrop Grumman for the National Reconnaissance Offi…
Ninth cargo delivery mission to the Chinese space station.
A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
Ride-share of 45 satellites including: * CAS500-2 (KASA, South Korea) The South Korean CAS500-1 and -2 satellites will image the Earth in pan-chr…
A batch of 29 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
Demonstration Flight for Russia's new Soyuz-5 launch vehicle, with a mass simulator on board. The launch was suborbital with the simulator splashing …
Amazon Leo, formerly known as Project Kuiper, is a mega constellation of satellites in Low Earth Orbit that will offer broadband internet access, thi…
A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.