NASA will roll out their first fully stacked Space Launch System (SLS) rocket to LC-39B, where it will complete a wet dress rehearsal (WDR) which involves loading the vehicle with propellants and taking the vehicle through the countdown to ignition where the countdown is halted.
After the WDR, NASA will roll the vehicle back to the Vehicle Assembly Building to complete final checks prior to rolling out for launch later this year.
The rollout is expected to take around 11 hours, and will utilise an upgraded crawler transporter - the same system its predecessors (Space Shuttle, Ares, Saturn, etc.) used.
Officially described as "Satellite-Internet Technology Demonstration Satellites". Probable 4 test satellites for the Chinese state-owned LEO communic…
Fram2 is the world’s first astronaut mission to polar orbit. Named after the Norwegian polar research ship Fram, the Crew Dragon spacecraft will laun…
A batch of 28 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
First flight of the Isar Spectrum launch vehicle.
Chinese classified satellite claimed to be for communication technology test purposes. Actual mission not known.
A batch of 27 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
Tianlian is a Chinese data tracking and relay communications geostationary satellite series. The TL 2 (Tian Lian 2) satellites represent the second g…
8 satellites for a constellation of satellites developed by Orora Technologies (OroraTech) of Germany, with thermal infrared cameras that can provide…
Classified payload for the US National Reconnaissance Office
6 weather satellites performing atmospheric measurements using GNSS Radio Occultation for a Tianjin based company. Constellation is planned to have a…