NASA will roll out their first fully stacked Space Launch System (SLS) rocket to LC-39B, where it will complete a wet dress rehearsal (WDR) which involves loading the vehicle with propellants and taking the vehicle through the countdown to ignition where the countdown is halted.
After the WDR, NASA will roll the vehicle back to the Vehicle Assembly Building to complete final checks prior to rolling out for launch later this year.
The rollout is expected to take around 11 hours, and will utilise an upgraded crawler transporter - the same system its predecessors (Space Shuttle, Ares, Saturn, etc.) used.
34th commercial resupply services mission to the International Space Station operated by SpaceX. The flight will be conducted under the second Commer…
Share-ride of 5 satellites to sun-synchronous orbit: * Taijing-3-05A/B * Tianyi-50 * Tianyan-27 * Jilin-1 HR-03D-55
2.8 tonnes Mass Simulator launched to a 900 km polar orbit on a test flight proving further upgrades to the ZQ-2E, including a longer 1st stage and e…
18 Low Earth Orbit communication satellites with Ku, Q and V band payloads for the G60 constellation operated by Shanghai Spacesail Technologies with…
Thirteenth batch of satellites for a reconnaissance satellite constellation built by SpaceX and Northrop Grumman for the National Reconnaissance Offi…
Ninth cargo delivery mission to the Chinese space station.
A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
Ride-share of 45 satellites including: * CAS500-2 (KASA, South Korea) The South Korean CAS500-1 and -2 satellites will image the Earth in pan-chr…
A batch of 29 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
Demonstration Flight for Russia's new Soyuz-5 launch vehicle, with a mass simulator on board. The launch was suborbital with the simulator splashing …