Josef Aschbacher, ESA Director General will outline the progress achieved after the successful hot firing test on 23 November 2023 at Europe’s Spaceport in Kourou, French Guiana, as well as the upcoming steps in the Ariane 6 development test campaign, including the tentative launch period for Ariane 6 together with:
- Martin Sion, CEO, ArianeGroup.
- Philippe Baptiste, President, CNES.
- Stéphane Israël, CEO, Arianespace
VICTUS HAZE will see Rocket Lab design, build, launch, and operate a rendezvous proximity operation (RPO) capable spacecraft. U.S. Space Force Space …
Fourteenth batch of satellites for a reconnaissance satellite constellation built by SpaceX and Northrop Grumman for the National Reconnaissance Offi…
Amazon Leo, formerly known as Project Kuiper, is a mega constellation of satellites in Low Earth Orbit that will offer broadband internet access, thi…
AST SpaceMobile’s Block 2 BlueBird satellites are designed to deliver up to 10 times the bandwidth capacity of the BlueBird Block 1 satellites, requi…
Note: Unofficial reports indicate there may be 1 or more additional satellites that failed to separate from the upper stage, however this is not offi…
A batch of 9 Low Earth Orbit communication satellites for the Chinese state owned SatNet constellation operated by the China Satellite Network Group.…
Classified experimental Chinese satellite of unknown purposes (officially described for "spatial environment detection" purposes).
A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
8 Earth observation satellites for the Jilin-1 commercial Earth observation satellites constellation: * High Resolution-04D 01-02 * High Resoluti…
A batch of 29 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.