Josef Aschbacher, ESA Director General will outline the progress achieved after the successful hot firing test on 23 November 2023 at Europe’s Spaceport in Kourou, French Guiana, as well as the upcoming steps in the Ariane 6 development test campaign, including the tentative launch period for Ariane 6 together with:
- Martin Sion, CEO, ArianeGroup.
- Philippe Baptiste, President, CNES.
- Stéphane Israël, CEO, Arianespace
Unknown satellite(s) for the Russian military.
A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
JAXA-manifested rideshare of eight separate spacecraft that includes educational small sats, an ocean monitoring satellite, a demonstration satellite…
Sub-orbital launch under Rocket Lab’s Hypersonic Accelerator Suborbital Test Electron (HASTE) program, details TBD.
Tenth of ten GPS III missions.
A batch of 25 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
AST SpaceMobile’s Block 2 BlueBird satellites are designed to deliver up to 10 times the bandwidth capacity of the BlueBird Block 1 satellites, requi…
Daqi-2 (DQ-2), also known as the Atmospheric Environment Monitoring Satellite/AEMS, is the second of follow-on series of Chinese satellites to the GF…
Unknown satellite(s) for the Russian military.
A batch of 25 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.